At a live solar farm in Devon, Lawinds delivered specialist tree works to reduce shading on solar panels and prevent damage from falling branches. The programme included selective crown reductions, crown lifts, and the retention of one ash as a 2-metre monolith to balance generation needs with biodiversity. All works were completed safely with minimal disruption to operations.
Client: Solar Farm Operator
Location: Devon, England
Environment: Live Solar Farm
We carried out targeted reductions on panel-side canopies to minimise shading, lifted crowns to improve light corridors, and removed significant deadwood that posed a risk of falling onto the panels. In the adjoining woodland, one dead ash was retained as a 2-metre habitat monolith to preserve ecological value. This approach increased panel efficiency while protecting infrastructure and maintaining tree health.
Reduced shading on panels, improving light access and efficiency
Prevented damage to solar infrastructure by removing hazardous branches
Works delivered on schedule with minimal disruption
Panels beneath work zones cleared of debris after completion
Long-term client relationship strengthened through consistent delivery
Full site-specific RAMS and site inductions completed prior to commencement of works.
Specialist tree rigging methods employed to ensure controlled lowering and eliminate risk of damage to solar panel assets below.
Fully insured with £10 million public liability cover, in line with national industry and client requirements.
If you manage trees at schools, nurseries, or public-facing facilities in Richmond, Lawinds Tree Care offers the expertise, planning, and compliance knowledge to deliver safe, reliable results.
Call 07789917414 or Contact Us Here to book your free tree survey and quote.